HeadlinesHealth

Abia Govt Reassures Residents Over Flooding Concerns Along Owerrinta Road

0

…Pledges Lasting Solution

UMUAHIA – The Abia State Government has taken note of a video circulating on social media showing flooding within a residential compound along the ongoing Owerri-Nta Road reconstruction corridor.

In a statement issued on Sunday, July 19, 2026, the Hon. Commissioner for Information, Prince Okey Kanu, said while empathising with the affected residents, the Government wishes to assure the public that the situation is receiving attention and will be adequately addressed as part of the ongoing road construction project.

According to the statement, preliminary observations indicate that the affected location has a long-standing topographical challenge arising from its naturally undulating terrain. The compound sits on a downward slope from the main road, a condition that has historically made it susceptible to water accumulation during periods of heavy rainfall.

“Residents and those familiar with the area can attest to the fact that the location has experienced flooding over the years, although the ongoing reconstruction works have temporarily amplified the situation,” the statement read.

The Government is also aware that the current public discourse surrounding the incident has unfortunately attracted political interpretations. However, the Government remains focused on facts, the welfare of residents, and the successful delivery of quality infrastructure rather than political distractions.

See also  Medical City: Abia Govt Announces Postponement of Flag-off Ceremony

The statement further noted that the road project is still under construction. Consequently, the present stage of work provides the Ministry of Works and the project contractor with the opportunity to further assess the drainage pattern and implement any necessary engineering adjustments to ensure that the completed project effectively addresses the concerns raised.

“The objective of the reconstruction and dualisation of the road is to improve the quality of life of the people of Abia State, enhance road safety, and facilitate economic activities — not to create hardship for residents,” it added.

The Commissioner stated that this administration has demonstrated its commitment to delivering infrastructure without causing avoidable environmental or residential challenges. Similar engineering concerns encountered during the reconstruction of the Onuimo–Umuahia Road corridor were successfully resolved, and the same level of professionalism and responsiveness will be applied in this case.

The Government also noted that the past two days have witnessed unusually heavy rainfall, a natural phenomenon that has contributed significantly to the flooding observed. Such extreme weather conditions, while uncommon, provide valuable insights that enable engineers to identify and address potential drainage deficiencies before project completion.

See also  ‎Three People Confirmed Dead during Mining in Ebonyi

Residents of the affected area are therefore encouraged to remain calm and be assured that the Abia State Government will work closely with the Ministry of Works and the contractor to ensure that the issue is comprehensively resolved.

“The administration of His Excellency Dr. Alex Chioma Otti, OFR, remains steadfast in its commitment to delivering durable, people-centred infrastructure while protecting the lives, property, and interests of all Abians,” the statement concluded.

Facebook Comments Box
Share with others

Gov Otti celebrates Bart Nnaji at 70, says Geometric Power is fueling Abia’s economic transformation

Previous article

Mbah Approves Distribution of 63,000 Bags of Fertilisers, Farm Inputs to Enugu Farmers

Next article

You may also like

Comments

Leave a reply

Your email address will not be published. Required fields are marked *

More in Headlines